Small kitchen
- Doors and drawer fronts
- Up to 20
- A typical timeline
- 5 to 6 days
- Doors sprayed flat in the studio
- Boxes sprayed in your kitchen
- Hinges re-hung, bumpers fitted
- New hardware
- Priced apart
- A second color
- Priced apart
Door-count bands
Count every door and every drawer front. The band is where your kitchen falls. The written estimate, after the walkthrough, gives the number.
Small kitchen | Medium kitchen | Large kitchen | |
|---|---|---|---|
| Doors and drawer fronts | Up to 20 | 21 to 35 | 36 to 55 |
| A typical timeline | 5 to 6 days | 6 to 8 days | 8 to 10 days |
| Doors sprayed flat in the studio | |||
| Boxes sprayed in your kitchen | |||
| Hinges re-hung, bumpers fitted | |||
| New hardware | Priced apart | Priced apart | Priced apart |
| A second color | Priced apart | Priced apart | Priced apart |
Repairs, hardware and a second color are written on the estimate.
A sample written estimate
A medium kitchen with 31 doors and drawer fronts, as the lines would be written. Yours is written from your own count.
Sample estimate, shown for the shape only.
Hardware and a second color are written as separate lines.
A sample, not a quote or an offer.
How pricing works
The number of doors and drawer fronts, the condition of the finish and the wood, whether you change color, and the style of the doors. Raised panels and glass take longer than flat ones.
Removal, prep, primer, two coats, the boxes, re-hanging and the walk-through. It lists the repairs we found and the color and sheen.
New hardware, repairs to water-damaged parts, a second color and replaced doors. These are priced apart, in writing.
Kylie or Denisse comes to your kitchen, counts, tests the finish and shows you sample doors. The visit costs nothing extra and does not oblige you to hire us.
The written estimate arrives within a few working days of the walkthrough, with dates, a payment schedule and the warranty terms.
Price questions
Count every door and every drawer front, one by one. A cabinet with a door over a drawer is two. Skip the boxes and the toe kicks. If you are between bands, tell us the number and we will check it at the walkthrough.
Because a kitchen is a count of doors, and a count is something you can check yourself. You can tell which band you fall in before you spend an hour on the phone.
New hardware, repairs to water-damaged or loose parts, a second color on the island, doors that are replaced instead of refinished and anything that needs a carpenter. If we find one of these at the walkthrough it is written on the estimate, so there is nothing to discover on day four.
A deposit holds your dates and orders materials, the balance is due when you have walked the kitchen with us and signed off. The amounts and dates are on the written estimate; we do not start without one.
When the boxes are swollen, sagging or water-damaged, when you want a new layout, or when the doors are cracked rather than worn. A refinish keeps your boxes and your layout. We will say so if replacement is the honest answer.